How Easy Is It To Get A Build Over Agreement

With regard to taking into account the impact of the new foundations and the current requirements of the construction law, which stipulates that the new foundations must have a depth of at least one metre. The depth of these foundations and the extra weight of the new structure can lead to broken leaks or pipes, which can lead to flooding. A Thames Water Build over Agreement is a quality label for proposed work and will generally be required for all excavation work within 3 metres of a public canal or flow. If you want to build sewers, you need a construction agreement. This is necessary if you plan to build a building, extension, support construction or similar work nearby or directly on an existing canal. The distance from the applicable sewer depends on several factors, including the depth of the sewers, as the sewers are critical, etc. although it is usually 3m. Anyone can apply for the contract, including an owner or contractor. The most relevant is the one who is qualified, experienced or insured to create the information folder required for the construction contract.

Of course, an entrepreneur may have the experience of the physical work associated with it, but this is completely independent of the experience in design and associated professional liability insurance. The owners of the United Kingdom have no assurance for this work. Frequent problems in the construction of the agreement that are not professional (do-it-yourself): we saw a case where the owner assumed that the contractor had handled the Thames Water Build over Agreement, while the contractor assumed it was the owner. This confusion resulted in a four-week delay in the work, while location studies were conducted, plans were drawn up and Thames Water Engineer visited the website. First of all – whether construction or expansion or work with the chassis – It depends on the individual situation, but for a construction application on a public sewer, they are probably necessary, the requirement of a construction overload agreement is in the H4 part of the building code sometimes questions arise when the owners try to sell their property , which is partly or entirely built on a public sewer. Conservatories and extensions are the usual criminals. If a Build Over Agreement was not obtained when the work was done, then the water company has the legal right to enter the land to reach the canal, even if that means demolishing the building above the canal.

Hello, I'm Alan and I'm an architect with over 5 years of experience. I will share my ideas and projects here.